Subsoil improvement

Excavation pit safety measures Amann Girrbach

Mäder, Austria / 10.2022 - 10.2022

PORR was commissioned by Goldbeck Rhomberg GmbH to carry out the excavation pit safety measures for the Amann Girrbach construction project in Mäder. Within a tight timeframe, the specialised civil engineering team implemented a safe and efficient solution as the basis for the new company headquarters.

Overview of construction site with excavation pit safety measures
© Bernhard Rogen

Facts & Figures


Company

Nägele Hoch- und Tiefbau GmbH

Type

Subsoil improvement, Foundation engineering

Runtime

10.2022 - 10.2022

Principal
Goldbeck Rhomberg GmbH

Construction of precise excavation pit safety measures using 4,000m² of sheet piling

In October 2022, PORR carried out the excavation pit securing work for the new headquarters of Amann Girrbach AG in 6841 Mäder. The project placed high demands on scheduling, speed of execution and technical precision, as the work had to be completed within a very compact construction period.

A total of around 4,000m² of sheet piling was installed to ensure a stable and reliable excavation pit for the subsequent construction phases. Despite the high safety requirements and the cramped local conditions, the entire sheet piling work was successfully completed in just six working days. This was made possible by the use of modern special civil engineering technology and the high level of expertise and experience of the PORR team in Vorarlberg.

What ultimately counts in the construction business is successfully completed projects. PORR has many of these.