Excavation pit safety measures Amann Girrbach
Mäder, Austria / 10.2022 - 10.2022
PORR was commissioned by Goldbeck Rhomberg GmbH to carry out the excavation pit safety measures for the Amann Girrbach construction project in Mäder. Within a tight timeframe, the specialised civil engineering team implemented a safe and efficient solution as the basis for the new company headquarters.
Facts & Figures
Company
Nägele Hoch- und Tiefbau GmbH
Type
Subsoil improvement, Foundation engineering
Runtime
10.2022 - 10.2022
Construction of precise excavation pit safety measures using 4,000m² of sheet piling
In October 2022, PORR carried out the excavation pit securing work for the new headquarters of Amann Girrbach AG in 6841 Mäder. The project placed high demands on scheduling, speed of execution and technical precision, as the work had to be completed within a very compact construction period.
A total of around 4,000m² of sheet piling was installed to ensure a stable and reliable excavation pit for the subsequent construction phases. Despite the high safety requirements and the cramped local conditions, the entire sheet piling work was successfully completed in just six working days. This was made possible by the use of modern special civil engineering technology and the high level of expertise and experience of the PORR team in Vorarlberg.