Laying tracks
The best-laid tracks
Construction sites are increasingly determined by construction site logistics, and railway construction is no exception. Our gantry cranes can lay up to 140 track m of sleepers per hour without great logistical effort. The cranes position themselves on the assister rail – no special sleeper wagons are needed.
Our gantry cranes can be used economically and efficiently to extend and reduce tracks in small and mid-sized construction projects. Transport to and from construction sites can be made on tracks or roads.